Are you planning to add an Extension, Second Storey Additions or Build a New Home?

Are you planning to add an Extension, Second Storey Additions or Build a New Home?

New Building Termite Barrier

Where new building work at or below ground level is carried out, termite barriers shall be Installed in accordance with AS 3660.1.

Where practical and possible the new termite barrier should be integrated with the existing systems so as to form a barrier system for the entire building. You will also need to have collars around your Pipe Penetrations to comply. We at Quality Termite Control can do this for you as quick as possible.

Please contact Quality Termite Control on 1800 656 343 for further inquiries, or to book your Free Site Assessment and Quotation.

Scroll to Top